5C05 0450 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 1st December 2025

operated by
South Western Railway
Arterio (10 coaches)
701033
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0450
0448
-2
EFD
0.00
0455
0455
N/R
0449
-6
UF
0.58
pass
0456½
pass
0452¼
-4
2.30
8
0500
0501½
pass
0454½
-6
UF
UMF
2.78
pass
0503
pass
0455½
-7
3.54
pass
0504
pass
0456¼
-7
4.26
pass
0505
pass
0457
-7
4.75
5
pass
0505½
pass
0458
-7
5.64
pass
0507
pass
0459¼
-7
6.24
14
0509
0501½
-7
UMF