5S93 1925 London Waterloo to Woking
Departing on 4th December 2025

operated by
South Western Railway
4 coaches
450105
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
15
1925
1925¼
DW
0.40
pass
1926½
pass
1927
DW
DWS
1.29
4
pass
1929
pass
1929¼
1.78
pass
1930½
pass
1930¼
DWS
DW
2.50
3
pass
1932
pass
1931¼
DW
DWS
3.17
pass
1933
pass
1932
3.74
6
pass
1934
pass
1933¼
DWS
DWS
4.60
1
pass
1935
pass
1935
5.72
4
pass
1937
pass
1936
7.07
4
pass
1938½
pass
1938¼
DWS
DH
7.54
2
pass
1939½
pass
1940
8.47
2
pass
1940½
pass
1941½
+1
9.34
pass
1941½
pass
1942¾
+1
9.53
2
pass
1942
pass
1943
+1
10.01
pass
1942½
pass
1943
10.52
2
pass
1943½
pass
1944
11.34
2
pass
1945½
pass
1945¾
12.10
2
pass
1947½
pass
1946¾
13.40
2
pass
1951
pass
1950¾
14.19
pass
1952
pass
1952½
14.48
pass
1957
pass
1953½
-3
DH
DT
16.01
2
pass
1959
pass
1956
-2
18.53
2
pass
2002
pass
1958¾
-2
20.15
2
pass
2003½
pass
2001½
-1
22.15
2
pass
2008
pass
2007¼
24.28
4
pass
2013
pass
2011¼
-1
DT
DC
26.68
1
pass
2017
pass
2016½
28.22
1
pass
2018½
pass
2018¼
29.25
pass
2019½
pass
2019¼
DC
DBC
30.24
pass
2022
No report
30.29
2
pass
2022
pass
2021
DBC
DS
31.51
3
pass
2024
pass
2022
-1
34.24
Approaching
Woking [WOK]
5
2029
2028½