5S93 1925 London Waterloo to Woking
Departing on 10th December 2025

operated by
South Western Railway
8 coaches
450106
450021
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
15
1925
1924
DW
0.40
pass
1926½
pass
1927
DW
DWF
1.29
3
pass
1929
pass
1930¼
+1
1.78
pass
1930½
pass
1931¾
+1
DWF
DW
2.50
3
pass
1932
pass
1933¾
+1
DW
DWS
3.17
pass
1933
pass
1934¾
+2
3.74
6
pass
1934
pass
1936½
+2
DWS
DWS
4.60
1
pass
1935
pass
1938
+2
5.72
4
pass
1937
pass
1939¼
+2
7.07
4
pass
1938½
pass
1941¼
+2
DWS
DH
7.54
2
pass
1939½
pass
1942¼
+3
8.47
2
pass
1940½
pass
1943½
+3
9.34
pass
1941½
pass
1944½
+2
9.53
2
pass
1942
pass
1944¾
+2
10.01
pass
1942½
pass
1945
+2
10.52
2
pass
1943½
pass
1946
+2
11.34
2
pass
1945½
pass
1947½
+1
12.10
2
pass
1947½
pass
1948¾
+1
13.40
2
pass
1951
pass
1950½
14.19
pass
1952
pass
1951½
14.48
pass
1957
pass
1952¼
-4
DH
DT
16.01
2
pass
1959
pass
1955
-4
18.53
2
pass
2002
pass
1957¼
-4
20.15
2
pass
2003½
pass
2000
-3
22.15
2
pass
2008
pass
2006
-1
24.28
4
pass
2013
pass
2010¼
-2
DT
DC
26.68
1
pass
2017
pass
2015¾
-1
28.22
1
pass
2018½
pass
2017¼
-1
29.25
pass
2019½
pass
2018¼
-1
DC
DBC
30.24
pass
2022
No report
30.29
2
pass
2022
pass
2020
-1
DBC
DS
31.51
3
pass
2024
pass
2021¼
-2
34.24
Approaching
Woking [WOK]
5
2029
2025¼
-3