5U09 0540 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 8th December 2025

operated by
South Western Railway
Arterio (10 coaches)
701031
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0540
No report
EP
0.00
0605
0605
No report
0.54
pass
0607½
pass
0605¾
-1
B
1.46
pass
0610
No report
2.44
pass
0613
pass
0610½
-2
3.15
pass
0615
pass
0615
FL
3.44
3
pass
0615½
pass
0616
EPR
DWF
4.30
4
pass
0617
pass
0617½
UWF
UWF
5.07
pass
0619
pass
0618
UWF
UW
5.54
2
pass
0619½
pass
0619
UW
UW
6.26
pass
0620½
pass
0619¾
6.75
2
pass
0622
pass
0620¾
7.64
pass
0624
pass
0623
UW
WR
8.24
14
0626
0625¾
UW