5U09 0540 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 9th December 2025

operated by
South Western Railway
Arterio (10 coaches)
701026
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0540
No report
EP
0.00
0605
0605
No report
0.54
pass
0607½
pass
0603½
-3
B
1.46
pass
0610
No report
2.44
pass
0613
pass
0608
-5
3.15
pass
0615
No report
FL
3.44
3
pass
0615½
pass
0616¼
EPR
DWF
4.30
4
pass
0617
pass
0617¾
UWF
UWF
5.07
pass
0619
pass
0618½
UWF
UW
5.54
2
pass
0619½
pass
0619½
UW
UW
6.26
pass
0620½
pass
0620
6.75
2
pass
0622
pass
0621½
7.64
pass
0624
pass
0623½
UW
8.24
16
0626
0626
UW