5Y82 0912 London Waterloo to Wimbledon Park Depot Sdgs
Departing on 1st December 2025

operated by
South Western Railway
Arterio (10 coaches)
701025
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
24
0912
0909¾
-2
WR1
0.40
pass
0913½
pass
0911
-2
WR1
DWF
1.29
3
pass
0914½
pass
0913¾
1.78
pass
0915½
pass
0915¼
DWF
DW
2.50
3
pass
0916½
pass
0917½
+1
DW
DWS
3.17
pass
0917½
pass
0918¾
+1
3.74
6
pass
0918½
pass
0920¼
+1
DWS
DWS
4.60
1
pass
0920
pass
0922
+1
DWS
EPR
5.09
1
pass
0921
pass
0922
+1
DR
5.60
pass
0924½
pass
0922¼
-2
6.58
pass
0927
No report
7.50
2
pass
0929½
pass
0932½
+3
DD
8.24
0931
0931
No report
EP