5Y82 0912 London Waterloo to Wimbledon Park Depot Sdgs
Departing on 3rd December 2025

operated by
South Western Railway
Arterio (10 coaches)
701017
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
19
0912
0854½
-17
DW
0.40
pass
0913½
pass
0858
-15
DW
DWF
1.29
3
pass
0914½
pass
0900½
-14
1.78
pass
0915½
pass
0901½
-13
DWF
DW
2.50
3
pass
0916½
pass
0903½
-13
DW
DWS
3.17
pass
0917½
pass
0904¼
-13
3.74
6
pass
0918½
pass
0905¾
-12
DWS
DWS
4.60
1
pass
0920
pass
0907½
-12
DWS
EPR
5.09
1
pass
0921
pass
0907
-14
DR
5.60
pass
0924½
pass
0907¾
-16
6.58
pass
0927
No report
7.50
2
pass
0929½
pass
0915
-14
DD
8.24
0931
0931
No report
EP