5Y82 0912 London Waterloo to Wimbledon Park Depot Sdgs
Departing on 10th December 2025

operated by
South Western Railway
Arterio (10 coaches)
701058
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
21
0912
0907¾
-4
WR1
0.40
pass
0913½
pass
0909
-4
WR1
DWF
1.29
3
pass
0914½
pass
0911¼
-3
1.78
pass
0915½
pass
0912½
-2
DWF
DW
2.50
3
pass
0916½
pass
0913¾
-2
DW
DWS
3.17
pass
0917½
pass
0914¼
-2
3.74
6
pass
0918½
pass
0916½
-1
DWS
DWS
4.60
1
pass
0920
pass
0918½
-1
DWS
EPR
5.09
1
pass
0921
pass
0918
-3
DR
5.60
pass
0924½
pass
0919¼
-5
6.58
pass
0927
No report
7.50
2
pass
0929½
pass
0925½
-4
DD
8.24
0931
0931
No report
EP