5Y88 1057 London Waterloo to Wimbledon Park Depot Sdgs
Departing on 1st December 2025

operated by
South Western Railway
Arterio (10 coaches)
701034
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
18
1057
1108¼
+11
UW
0.40
pass
1058½
pass
1109¾
+11
UW
DWF
1.29
3
pass
1100½
pass
1112
+11
1.78
pass
1101½
pass
1113
+11
DWF
DW
2.50
3
pass
1102½
pass
1114¼
+11
DW
DWS
3.17
pass
1103½
pass
1115
+11
3.74
6
pass
1104½
pass
1119
+14
DWS
DWS
4.60
1
pass
1106
pass
1121¼
+15
DWS
EPR
5.09
1
pass
1107
pass
1121
+14
DR
5.60
pass
1109
pass
1121¼
+12
6.58
pass
1111½
No report
7.50
2
pass
1113½
pass
1128½
+15
DD
8.24
1115
1115
No report
EP