2G66 2004 Guildford to London Waterloo
Departing on 17th December 2025

operated by
South Western Railway
Arterio (10 coaches)
701053
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Guildford [GLD]
Pathed as Electric multiple unit at 75mph
2
2004
2004
2003¾
UC
1.23
1
2008
2008
2007½
2008
2007¼
2008
4.44
1
2013
2013
2012½
2013½
2012¼
2013
7.54
1
2018
2018
2017½
2018½
2017
2017¾
8.60
1
2021
2022
2021
2022
2019¾
2021½
11.07
1
2025
2026
2025
2026
2024¾
2026
12.71
1
2029
2030
2029
2030
2028
2030
14.59
1
2033
2033
2032½
2033½
2032½
2033
15.66
1
2036
2036
2035½
2036
2034¼
2036½
16.55
pass
2038½
pass
2038
UC
US
17.78
1
2040
2041
2040
2041½
2040½
2041¼
US
US
18.62
pass
2043
No report
19.03
1
pass
2043½
pass
2043
20.19
1
pass
2045
pass
2044¼
SL
21.30
2
pass
2046½
pass
2047¼
22.32
pass
2048
pass
2049¼
+1
22.62
5
2049
2050
2049
2050
2050¼
2051¼
+1
US
23.53
pass
2051½
pass
2053
+1
24.35
2
2053
2053
2053
2053½
2054¾
2055½
+2
26.07
10
2057
2057
2056½
2057½
2058
2058¾
+1
US
UMS
26.55
pass
2058½
pass
2100
+1
27.31
pass
2059½
pass
2100½
+1
28.03
pass
2100½
pass
2101¼
+1
28.52
7
2102
2102
2101½
2102½
2102¾
2103½
+1
29.41
pass
2104½
pass
2105
30.01
4
2107
2107
2107¼
UMS