2H66 2011 Shepperton to London Waterloo
Departing on 14th December 2025

operated by
South Western Railway
Arterio (10 coaches)
701041
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Shepperton [SHP]
Pathed as Electric multiple unit at 75mph
1
2011
2011
2011
US
1.39
1
2014
2014
2014
2014½
2014
2014½
2.09
1
2016
2016
2016
2016½
2016
2016½
2.45
1
2018
2018
2017½
2018
2017¾
2018
4.26
1
2021
2021
2021
2021½
2021
2021
5.78
1
2024
2024
2024
2024½
2024
2024¾
6.17
pass
2026
pass
2025¼
6.41
pass
2027
pass
2026¼
US
UK
7.16
2
2029
2029
2028½
2029
2028
2028¾
8.26
1
2031
2031
2031
2031½
2031
2031¾
8.61
3
2033
2034
2033
2034½
2033
2033¾
9.46
1
2036
2036
2036
2036½
2035¼
2036¼
11.08
1
2040
2040
2040
2040½
2039¼
2039¾
UK
US
12.19
2
2043
2043
2042½
2043
2042¼
2042¾
13.21
pass
2045
pass
2044¾
13.51
5
2046
2047
2046
2047
2046
2046¾
US
14.42
pass
2048½
pass
2048½
15.24
2
2050
2050
2050
2050½
2050½
2051
16.76
10
2054
2054
2053½
2054½
2054
2055¼
US
UMS
17.44
pass
2055½
pass
2056¼
18.20
pass
2056½
pass
2057
18.72
pass
2057½
pass
2057¾
19.41
7
2059
2059
2058½
2059½
2059¾
2100½
+1
20.30
pass
2101½
pass
2102
20.70
4
2104
2104
2106¼
+2
UMS