5J90 0635 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 17th December 2025

operated by
South Western Railway
Arterio (10 coaches)
701060
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0635
0637
+2
EFD
0.00
0640
0640
N/R
0639
-1
UF
0.58
pass
0641½
pass
0642
2.30
8
pass
0644½
pass
0644¼
UF
UMF
2.78
pass
0645½
pass
0645
3.54
pass
0646
pass
0645¾
4.26
pass
0647
pass
0646¼
4.75
5
pass
0648
pass
0647¼
5.64
pass
0649
pass
0648¼
6.24
9
0651
0650¾
UMF