9W98 1007 London Paddington to Gidea Park
Departing on 12th December 2025

operated by
Elizabeth Line
9 coaches
345003

This service is partially cancelled

This service was cancelled between Gidea Park and Shenfield due to a signalling systems failure (IF).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Paddington [PAD]
Pathed as Class 345 EMU at 90mph
A
1007
1007
1007
1.39
A
1010
1010
1009½
1010
1009½
1010
2.11
A
1012
1012
1011½
1012½
1011½
1012½
3.44
A
1015
1015
1014½
1015½
1014¾
1015½
4.21
A
1017
1018
1017
1018
1017
1018¼
5.43
A
1020
1020
1020
1020½
1020
1020¾
6.11
pass
1021½
pass
1021¾
8.13
pass
1024
pass
1023
-1
EL
8.40
pass
1024
No report
8.56
pass
1024½
No report
8.69
8
1025
1026
1025
1026
1025
1026
EL
EL
9.04
pass
1027
No report
9.25
2
1028
1028
1028
1028½
1027¼
1027¾
10.07
2
1030
1030
1030
1030½
1029½
1030
EL
10.49
pass
1031½
pass
1030¾
DE
DE
11.06
2
1033
1033
1032½
1033
1032
1032¾
EL
EL
11.27
pass
1033½
No report
12.15
4
1035
1035
1035
1035½
1039
1039½
+4
DE
DE
12.50
pass
1036½
No report
13.32
4
1038
1038
1038
1038½
1043½
1044¼
+5
14.09
4
1040
1040
1040
1040½
1046
1046¾
+6
14.65
4
1042
1042
1042
1042½
1048¼
1048¾
+6
16.66
pass
1044½
No report
17.16
5
1046
1046
1045½
1046
1054¾
1056
+10
17.25
pass
1046½
No report
18.27
4
1048
1049
1048
1049
1101½
+13
EL
19.09
pass
1050½
-
19.62
1052
1052
1051½
1052
-
23.02
1056
1056
1055½
1056
-
24.30
pass
1058½
-
25.02
1102
1100
-