2N03 0529 London Bridge to Gravesend
Departing on 9th December 2025

operated by
Southeastern
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 75mph
2
0529
0529
0528¾
1
0.28
pass
0530
pass
0529½
0.53
pass
0530½
pass
0530¼
1.02
pass
0531
pass
0530½
1.43
pass
0531½
pass
0531
2.06
pass
0532
pass
0532
2.36
pass
0532½
pass
0532½
2.79
C
pass
0533½
pass
0533½
1
DS
3.40
pass
0534
pass
0534½
3.58
2
pass
0534½
pass
0534½
DS
DNK
4.15
2
0536
0537
0536
0537
0536
0537
DNK
DMK
4.32
pass
0538
pass
0537½
DMK
DCH
4.54
pass
0538½
pass
0538¼
DCH
DS
5.34
6
0541
0542
0541
0542
0540¾
0541¾
DS
DDL
5.63
pass
0543
pass
0542¾
6.04
2
0544
0544
0543½
0544
0543¼
0544½
7.58
2
0547
0547
0547
0547½
0548
0548½
+1
8.50
2
0550
0550
0549½
0550½
0550¾
0551½
+1
10.11
2
0553
0554
0553
0554
0554
0554¾
DDL
DDL
11.06
2
0556
0556
0556
0556½
0556¾
0557¾
+1
12.07
2
0559
0559
0558½
0559
0559¾
0600½
+1
13.43
2
0602
0602
0601½
0602½
0603
0603¾
+1
14.29
pass
0603½
pass
0605¾
+2
14.61
pass
0604½
pass
0607½
+3
DDL
DM
15.20
4
0606
0607
0606
0607½
0609½
0610½
+3
DM
DNK
17.15
2
0612
0612
0611½
0612
0614½
0615
+3
17.77
2
0614
0615
0614
0615
0616¾
0617¼
+2
19.22
2
0618
0618
0617½
0618
0619¾
0620¼
+2
19.56
pass
0619
No report
19.77
2
0620
0620
0619½
0620
0621¾
0622¼
+2
20.50
pass
0621
pass
0623½
+2
22.03
0
0625
0625
0627¾
+2
DNK