5U36 1512 Grove Park Down C.H.S. to London Victoria
Departing on 3rd December 2025

operated by
Southeastern
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Grove Park Down C.H.S.
Pathed as Electric multiple unit at 100mph
1512
1512
0.25
1515
1515
1514½
1514¾
CHS
UG
0.36
pass
1517
pass
1515½
-1
UG
0.64
3
pass
1519½
pass
1520¼
UG
US
1.44
pass
1521½
pass
1524¼
+2
US
UCH
1.66
pass
1522½
pass
1525
+2
UCL
UMK
2.03
1
pass
1523
pass
1526¾
+3
UMK
UL
2.27
pass
1524
pass
1528½
+4
UL
3.55
pass
1527½
pass
1532½
+5
3.67
1
pass
1528
pass
1533
+5
UL
UCL
4.51
3
pass
1530
pass
1534¼
+4
4.77
pass
1531
pass
1535
+4
AL
5.42
3
pass
1532
pass
1535½
+3
5.76
pass
1532½
pass
1536¼
+3
6.78
pass
1534½
pass
1539
+4
7.43
pass
1535½
pass
1539¾
+4
7.53
pass
1535½
pass
1540
+4
UCM
UCF
7.73
pass
1536
pass
1540¼
+4
8.08
pass
1536
pass
1540½
+4
8.39
pass
1538
No report
9.02
pass
1539½
pass
1541¾
+2
SL
9.75
7
1549
1545¾
-3
UCF