5J84 0918 London Bridge to Grove Park Up C.H.S.
Departing on 10th December 2025

operated by
Southeastern

This service is partially cancelled

This service was cancelled between London Charing Cross and London Bridge due to a signalling problem (track circuit failure) (IC).

WTT
RTTRealtime
Route
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
London Charing Cross [CHX]
Pathed as Electric multiple unit at 75mph
0911
-
9
0918
0918
0908½
-9
7
pass
0919
pass
0909
-9
pass
0919½
pass
0909½
-10
pass
0920½
pass
0910½
-10
pass
0922
pass
0921¼
7
DKF
pass
0924½
pass
0925½
+1
DKF
DF
pass
0925½
pass
0926½
+1
pass
0926
pass
0926¾
+1
pass
0927
pass
0927¼
DKF
DKF
2
pass
0928½
pass
0930¼
+1
pass
0930½
pass
0932