2S94 1743 London Charing Cross to Orpington
Departing on 10th December 2025

operated by
Southeastern

This service is cancelled.

This service was cancelled due to a signalling problem (track circuit failure) (IC).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Charing Cross [CHX]
Pathed as Electric multiple unit at 75mph
1743
1743
-
0.61
1746
1746
1745½
1746½
-
1.23
pass
1748
-
1.31
pass
1748½
-
1.69
1750
1752
1750
1752
-
2.42
pass
1753
-
2.71
pass
1753½
-
3.32
pass
1754
-
4.68
pass
1757
-
5.47
pass
1758½
-
6.36
pass
1759½
-
7.16
pass
1801
-
7.44
pass
1801½
-
8.78
1805
1805
1804½
1805½
-
10.21
1808
1809
1808
1809
-
11.19
1811
1812
1811
1812
-
12.24
pass
1813½
-
12.53
1815
1815
1814½
1815½
-