2S18 0829 London Charing Cross to Orpington
Departing on 10th December 2025

operated by
Southeastern

This service is partially cancelled

This service was cancelled between Orpington and Sevenoaks due to a signalling problem (track circuit failure) (IC).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Charing Cross [CHX]
1
Pathed as Electric multiple unit at 75mph
2
0829
0829
0844¼
+15
UXS
0.61
A
0833
0834
0832½
0834½
0847¼
0848
+13
1.23
pass
0836
pass
0849½
+13
DXS
DCX
1.31
pass
0836½
pass
0850¼
+14
1.69
6
0838
0840
0838
0840
0853
0854¼
+14
DCX
6
2.17
pass
0841
pass
0855
+14
2.42
pass
0841
pass
0855¾
+14
2.71
pass
0841½
pass
0857
+15
3.32
pass
0842
pass
0859¼
+17
6
DKF
4.68
pass
0845
pass
0902
+17
DKF
DF
5.29
pass
0846
pass
0912¼
+26
DF
DTH
5.57
pass
0847
pass
0913½
+26
DTH
DL
6.01
2
0848
0849
0848
0849
0915¼
0916¼
+27
DL
DMK
6.18
pass
0850
pass
0917
+27
DMK
DCH
6.40
pass
0850½
pass
0917¾
+27
DCH
DS
7.20
4
0853
0854
0853
0854
0920¼
0924¼
+30
SL
7.48
pass
0855
pass
0926
+31
9.02
3
0857
0858
0857
0858
0928¾
0929½
+31
DS
DF
10.25
4
0901
0901
0900½
0901
0932½
0933
+32
11.23
4
0903
0903
0903
0903½
0934¾
0935½
+32
12.28
pass
0905
pass
0937
+32
12.57
4
0907
0908
0907
0908
0938
0938¾
+30
13.69
4
0912
0914
0912
0914
0945½
+33
DS
15.29
0917
0917
0916½
0917
-
16.48
0920
0920
0919½
0920½
-
20.50
0925
0925
0925
0925½
-