2P65 1956 London Cannon Street to London Cannon Street
Departing on 11th December 2025

operated by
Southeastern
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Cannon Street [CST]
Pathed as Electric multiple unit at 75mph
4
1956
1956
1955½
DCS
0.38
pass
1957½
pass
1957½
DCS
0.56
1
1959
2001
1959
2001
1958¾
2001
DCS
1
1.04
pass
2002
pass
2001¾
1.29
pass
2002½
pass
2002¼
1.58
pass
2003
pass
2002¾
2.19
pass
2003½
pass
2117
+73
2.62
pass
2004
pass
2004
3.12
pass
2004½
pass
2004½
1
DGW
3.63
2
2006
2006
2006
2006½
2006
2006¾
4.23
1
2008
2009
2008
2009
2008½
2009¼
5.14
2
2012
2012
2011½
2012
2012
2012
5.63
2
2014
2014
2013½
2014
2014¼
2015
+1
6.22
pass
2015½
pass
2016
6.31
2
2016
2017
2016
2017
2016¾
2017½
DGW
DNK
7.43
2
2020
2020
2020
2020½
2020
2021
8.19
2
2023
2023
2022½
2023½
2023
2024
8.68
2
2025
2025
2025
2025½
2025½
2026¼
10.30
2
2029
2029
2028½
2029½
2029¼
2030¼
11.62
2
2032
2032
2032
2032½
2032½
2033
13.05
2
2035
2035
2035
2035½
2035¾
2036¼
14.17
2
2039
2039
2038½
2039½
2038½
2040
DNK
UEL
14.31
Erith Loop
Service stops for pathing (passing train)
2041½
2041½
pass
2040¾
14.44
pass
2042
pass
2041
UEL
UBH
15.60
1
2045
2046
2045
2046
2043½
2045¾
16.72
1
2049
2049
2048½
2049½
2047¾
2049¼
18.23
1
2052
2052
2052
2052½
2051¼
2052
19.24
1
2055
2055
2054½
2055
2054
2055
20.40
1
2057
2058
2057
2058
2057½
2058
21.57
1
2101
2101
2100½
2101
2100¾
2101½
22.56
1
2104
2105
2104
2105
2104¾
2105½
23.47
3
2108
2109
2107½
2109
2108¼
2109
UNK
24.04
1
2111
2111
2110½
2111½
2110¾
2112¼
UNK
US
24.22
pass
2112
pass
2112¾
24.63
A
2113
2114
2113
2114
2113¾
2114¾
US
3
25.26
pass
2115
pass
2115¾
25.56
pass
2115½
pass
2116½
+1
26.60
pass
2117
pass
2117½
27.09
pass
2117½
pass
2118
27.34
pass
2118
pass
2118¾
27.62
3
2119
2121
2119
2121
2120
2121¼
3
UCS
28.00
pass
2122
pass
2122
UCS
MRV
28.38
5
2125
2125
2124¼
MRV