2N92 1807½ Lee to Gravesend
Departing on 10th December 2025

operated by
Southeastern

This service is partially cancelled

This service was cancelled between London Charing Cross and Lee due to a signalling problem (track circuit failure) (IC).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Charing Cross [CHX]
Pathed as Electric multiple unit at 75mph
1741
1741
-
0.61
1744
1744
1743½
1744½
-
1.23
pass
1746
-
1.31
pass
1746½
-
1.69
1748
1750
1748
1750
-
2.42
pass
1751
-
2.71
pass
1751½
-
3.32
pass
1752
-
4.68
pass
1755
-
5.57
pass
1757
-
6.01
1759
1800
1759
1800
-
6.40
pass
1801½
-
7.20
1804
1805
1804
1805
-
7.49
pass
1806
-
7.70
2
1807
1807
1806½
1807½
1811½
+4
DDL
9.44
2
1811
1811
1810½
1811
1814¼
1814¾
+3
10.36
2
1813
1814
1813
1814
1816¾
1817½
+3
11.77
2
1817
1817
1816½
1817½
1820
1820½
+3
DDL
DDL
12.72
2
pass
1819
pass
1822
+3
13.73
2
1821
1821
1820½
1821½
1823¾
1824½
+3
15.29
2
1826
1827
1826
1827
1827¼
1828
+1
16.15
pass
1828
pass
1830
+2
16.47
pass
1829
pass
1835¾
+6
DDL
DM
17.06
4
1833
1834
1833
1834
1839¼
1840¼
+6
DM
DNK
19.01
2
1838
1838
1838
1838½
1844¼
1844¾
+6
19.63
2
1841
1841
1840½
1841½
1847
1847½
+6
21.08
2
1844
1844
1844
1844½
1850¾
1851½
+7
21.42
pass
1845½
No report
21.63
2
1846
1847
1846
1847
1853
1853½
+6
22.36
pass
1848½
pass
1854½
+6