2C52 1723 Dartford to London Charing Cross
Departing on 10th December 2025

operated by
Southeastern

This service is cancelled.

This service was cancelled due to a signalling problem (track circuit failure) (IC).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.39
pass
1724½
-
1.01
pass
1725
-
1.57
pass
1726½
-
2.06
pass
1727½
-
3.22
1730
1731
1729½
1731½
-
4.34
1734
1735
1734
1735
-
5.65
1738
1738
1737½
1738
-
6.66
1740
1740
1740
1740½
-
8.02
1743
1743
1742½
1743½
-
9.19
1746
1747
1746
1747
-
10.18
1750
1751
1750
1751
-
11.09
1754
1755
1753½
1755
-
12.22
pass
1758
-
13.58
pass
1800
-
14.19
pass
1801
-
14.48
pass
1801½
-
15.21
1803
1805
1803
1805
-
15.59
pass
1806½
-
15.67
pass
1807
-
16.29
1809
1811
1809
1811
-