1H34 1254 London Bridge to Hastings
Departing on 10th December 2025

operated by
Southeastern

This service is partially cancelled

This service was cancelled between London Charing Cross and London Bridge due to a signalling problem (track circuit failure) (IC).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Charing Cross [CHX]
Pathed as Electric multiple unit at 100mph
1245
1245
-
0.61
1248
1248
1247½
1248½
-
1.23
pass
1250
-
1.31
pass
1250½
-
1.69
2
1252
1254
1252
1254
1259¼
+5
2
2.17
pass
1255
No report
2.42
pass
1255
pass
1300½
+5
2.71
pass
1255½
pass
1300¾
+5
3.32
pass
1256
pass
1301
+5
DKF
4.68
B
pass
1258
pass
1303½
+5
DS
5.29
pass
1259
pass
1304½
+5
5.47
2
pass
1259
pass
1304½
+5
6.36
pass
1300
pass
1305¾
+5
DS
DF
7.16
2
pass
1301½
pass
1307½
+6
FL
7.44
pass
1302
pass
1307½
+5
8.78
3
pass
1303½
pass
1309¼
+5
FL
10.21
2
pass
1304½
pass
1310½
+6
11.19
2
pass
1305½
pass
1311½
+6
12.24
pass
1306½
pass
1312
+5
12.53
2
pass
1307
pass
1312¾
+5
13.65
3
1309
1309
1308½
1309½
1314¼
1315
+5
DF
DM
15.25
2
pass
1311½
pass
1317¼
+6
16.44
2
pass
1312½
pass
1318½
+6
20.46
2
pass
1316
pass
1321½
+5
22.09
3
1318
1319
1318
1319½
1323½
1324
+4
DM
DM
27.02
2
1325
1325
1325
1325½
1329¼
1330¼
+4
29.46
3
1330
1331
1329½
1331
1334¼
1335¾
+4
DM
DH
30.27
pass
1332½
pass
1337¾
+5
DD
32.74
2
1336
1336
1336
1336½
1341
1342
+5
33.60
pass
1338
pass
1343¼
+5
34.36
2
1340
1341
1339½
1341
1344¾
1347
+6
35.23
pass
1343
pass
1348¾
+5
36.57
2
1345
1345
1345
1345½
1351
1351¾
+6
39.27
2
1350
1350
1349½
1350½
1355½
1356¼
+5
40.44
pass
1352
pass
1358¼
+6
43.70
2
1356
1356
1356
1356½
1401¾
1403
+6
47.38
2
1401
1401
1400½
1401½
1407¼
1408
+6
49.51
2
1405
1405
1404½
1405
1411¼
1411¾
+6
51.62
pass
1408
pass
1414½
+6
55.50
2
1412
1413
1412
1413
1418½
1419¼
+6
57.54
2
1417
1417
1416½
1417
1422¾
1423¼
+6
60.63
2
1422
1423
1422
1423
1428¼
1429¼
+6
60.73
pass
1423½
pass
1429¾
+6
61.59
2
1426
1426
1425½
1426½
1432
1432¾
+6
62.37
3
1429
1429
1435¾
+6
DH