2S11 0652 London Waterloo to Weybridge
Departing on 18th December 2025

operated by
South Western Railway
5 coaches
458535
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
16
0652
0652
0651¾
DW
0.40
pass
0653½
pass
0653¼
DW
DWS
1.29
4
0656
0656
0655½
0656½
0655¼
0656¾
1.78
pass
0658
pass
0658
DWS
DW
2.50
3
0659
0659
0659
0659½
0659¼
0700
DW
DWF
3.17
pass
0700½
pass
0701
3.74
5
0702
0702
0701½
0702½
0702½
0703
4.60
2
0705
0705
0704½
0705
0704¾
0705½
5.72
3
0707
0708
0707
0708
0707¾
0708½
7.07
3
0711
0712
0710½
0712½
0711
0711¾
DWF
DH
7.54
2
0714
0714
0714
0714½
0713½
0714¼
8.47
2
0717
0717
0716½
0717½
0716¼
0717
9.34
pass
0719
pass
0718½
9.53
2
0720
0720
0719½
0720
0719
0720
10.01
pass
0721
pass
0720½
10.52
2
0722
0723
0722
0723
0722
0723
11.34
2
0725
0725
0724½
0725
0724½
0725½
12.10
2
0727
0727
0726½
0727
0727
0727¾
13.40
2
0730
0732
0729½
0732
0730¼
0731¾
14.19
pass
0733½
pass
0733
14.48
pass
0734½
pass
0734
DH
DT
16.01
2
0738
0738
0737½
0738½
0736½
0737¾
18.53
2
0742
0742
0742
0742½
0741¼
0742
20.15
2
0746
0746
0745½
0746½
0744¾
0745¾
22.15
2
0751
0751
0750½
0751
0750¾
0751¾
24.28
4
0755
0755
0755
0755½
0756¼
0756¾
+1
DT
DC
26.68
1
0800
0801
0800
0801
0801¼
0802½
+1
28.22
1
0804
0804
0803½
0804
0805
0806¼
+2
29.25
pass
0805½
pass
0808
+2
30.05
Approaching
Weybridge [WYB]
1
0808
0808
0810½
+2
DC