5D03 0500 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 16th December 2025

operated by
South Western Railway
Arterio (10 coaches)
701026
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0500
0458
-2
EFD
0.00
0505
0505
N/R
0459
-6
UF
0.58
pass
0506½
pass
0502¼
-4
2.30
8
pass
0509½
pass
0504½
-4
UF
UMF
2.78
pass
0510½
pass
0506
-4
3.54
2
pass
0511
pass
0507¾
-3
UW
4.26
pass
0512
pass
0508½
-3
4.75
2
pass
0513
pass
0510
-2
5.64
pass
0514
pass
0511½
-2
UW
WR1
6.24
22
0516
0513¾
-2
WR1