5D03 0500 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 17th December 2025

operated by
South Western Railway
Arterio (10 coaches)
701030
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0500
0506
+6
EFD
0.00
0505
0505
N/R
0507
+2
UF
0.58
pass
0506½
pass
0510¼
+3
2.30
8
pass
0509½
pass
0512¾
+3
UF
UMF
2.78
pass
0510½
pass
0514
+3
3.54
2
pass
0511
pass
0515¾
+4
UW
4.26
pass
0512
pass
0517
+4
4.75
2
pass
0513
pass
0518¼
+5
5.64
pass
0514
pass
0520
+6
UW
WR1
6.24
21
0516
0521¾
+5
WR1