5D03 0500 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 18th December 2025

operated by
South Western Railway
Arterio (10 coaches)
701060
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0500
0501
+1
EFD
0.00
0505
0505
N/R
0502
-3
UF
0.58
pass
0506½
pass
0505½
-1
2.30
8
pass
0509½
pass
0508
-1
UF
UMF
2.78
pass
0510½
pass
0509½
3.54
2
pass
0511
pass
0511
UW
4.26
pass
0512
pass
0512
4.75
2
pass
0513
pass
0513¼
5.64
pass
0514
pass
0514¾
UW
WR2
6.24
22
0516
0516½
WR2