5D03 0500 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 19th December 2025

operated by
South Western Railway
Arterio (10 coaches)
701033
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0500
0506
+6
EFD
0.00
0505
0505
N/R
0507
+2
UF
0.58
pass
0506½
pass
0510
+3
2.30
8
pass
0509½
pass
0512
+2
UF
UMF
2.78
pass
0510½
pass
0513
+2
3.54
2
pass
0511
pass
0514¾
+3
UW
4.26
pass
0512
pass
0515¾
+3
4.75
2
pass
0513
pass
0517
+4
5.64
pass
0514
pass
0519
+5
UW
WR2
6.24
22
0516
0520¾
+4
WR2