5D05 0520 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 18th December 2025

operated by
South Western Railway
Arterio (10 coaches)
701056
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0520
0522
+2
EFD
0.00
0525
0525
N/R
0523
-2
UF
0.58
pass
0526½
pass
0526½
2.30
8
pass
0529½
pass
0529¼
UF
UMF
2.78
pass
0531
pass
0530
3.54
pass
0533
pass
0532½
4.26
pass
0534½
pass
0533¼
-1
4.75
5
pass
0536
pass
0534¾
-1
UMF
UMS
5.64
pass
0537½
pass
0536¾
6.24
2
0542½
0541¾
UMS