5Y86 1010 London Waterloo to Wimbledon Park Depot Sdgs
Departing on 18th December 2025

operated by
South Western Railway
5 coaches
458535
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
22
1010
1006
-3
WR1
0.40
pass
1011½
pass
1007
-4
WR1
DWF
1.29
3
pass
1013
pass
1009½
-3
1.78
pass
1014
pass
1010½
-3
DWF
DW
2.50
3
pass
1015
pass
1011¾
-3
DW
DWS
3.17
pass
1017
pass
1012½
-4
3.74
6
pass
1019½
pass
1019½
DWS
DWS
4.60
1
pass
1021
pass
1021½
DWS
EPR
5.09
1
pass
1022
pass
1021
-1
DR
5.60
East Putney [ZPU]
½
Service stops for pathing (passing train)
1024
1027
1023
1021½
-5
6.58
pass
1030
No report
7.50
2
pass
1032
pass
1029
-3
DD
8.24
1033½
1033½
No report
EP