5J60 0859 London Charing Cross to Grove Park C.S.D.
Departing on 16th December 2025

operated by
Southeastern

This service is cancelled.

This service was cancelled due to a signalling problem (track circuit failure) (IC).

WTT
RTTRealtime
Route
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
London Charing Cross [CHX]
Pathed as Electric multiple unit at 100mph
0859
-