1S96 0845 London Charing Cross to Orpington
Departing on 16th December 2025

operated by
Southeastern

This service is cancelled.

This service was cancelled due to a signalling problem (track circuit failure) (IC).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Charing Cross [CHX]
Pathed as Electric multiple unit at 75mph
0845
0845
-
0.61
0848
0848
0847½
0848½
-
1.23
pass
0850
-
1.31
pass
0850½
-
1.69
0852
0853
0852
0853
-
2.42
pass
0854
-
2.71
pass
0854½
-
3.32
pass
0855
-
4.68
pass
0858
-
5.47
pass
0859
-
6.36
pass
0900
-
7.16
pass
0901½
-
7.44
pass
0902
-
8.78
pass
0904
-
10.21
pass
0906½
-
11.19
pass
0908
-
12.24
pass
0912½
-
12.53
pass
0913
-