1S94 0812 London Charing Cross to Orpington
Departing on 16th December 2025

operated by
Southeastern

This service is cancelled.

This service was cancelled due to a signalling problem (track circuit failure) (IC).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Charing Cross [CHX]
Pathed as Electric multiple unit at 75mph
0812
0812
-
0.61
0815
0815
0814½
0815½
-
1.23
pass
0818
-
1.31
pass
0818½
-
1.69
0820
0822
0820
0822
-
2.42
pass
0823
-
2.71
pass
0823½
-
3.32
pass
0824
-
4.68
pass
0827
-
5.47
pass
0828
-
6.36
pass
0829
-
7.16
pass
0830½
-
7.44
pass
0831
-
8.78
pass
0833½
-
10.21
pass
0836
-
11.19
pass
0837½
-
12.24
pass
0842
-
12.53
pass
0843½
-