1U60 1744 Maidstone East to London Charing Cross
Departing on 18th December 2025

operated by
Southeastern

This service is cancelled.

This service was cancelled due to a problem with the traction equipment (MD).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
1744
1744
-
2.33
pass
1748
-
4.12
pass
1750
-
5.15
1752
1753
1752
1753
-
10.30
1800
1800
1759½
1800½
-
12.77
pass
1803
-
15.23
pass
1805
-
15.70
1807
1808
1807
1808
-
17.24
pass
1810
-
19.44
pass
1813
-
22.45
1817
1818
1817
1818
-
25.19
pass
1821
-
26.59
pass
1822½
-
27.50
pass
1825
-
28.48
pass
1826
-
29.71
pass
1827
-
31.25
pass
1828
-
31.53
pass
1828½
-
32.33
pass
1830
-
33.22
pass
1831
-
34.01
pass
1832
-
35.37
pass
1834
-
35.78
pass
1835
-
36.27
pass
1835½
-
37.00
1837
1839
1837
1839
-
37.38
pass
1840½
-
37.46
pass
1841
-
38.08
1844
1845
1844
1845
-