5Y80 2352 London Waterloo to Wimbledon Park Depot Sdgs
Departing on 4th December 2025

operated by
South Western Railway
Arterio (10 coaches)
701037
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
18
2352
2349½
-2
DW
0.40
pass
2353½
pass
2351
-2
DW
DWS
1.29
4
pass
2355
pass
2353
-1
1.78
pass
2356
pass
2354½
-1
DWS
DW
2.50
3
pass
2357
pass
2357¾
DW
DWS
3.17
pass
2359
pass
2359¼
3.74
6
pass
0001½
pass
0000½
DWS
DWS
4.60
1
pass
0003
pass
0001¾
-1
DWS
EPR
5.09
1
pass
0004
pass
0001½
-2
DR
5.60
pass
0009
pass
0001¾
-7
6.58
pass
0012½
No report
7.50
2
pass
0015½
pass
0008½
-7
DD
8.24
0018
0018
0009
0009
EP