1C02 0532 London Kings Cross to Cambridge
Departing on 12th December 2025

operated by
Thameslink
12 coaches
700152
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Kings Cross [KGX]
Pathed as Class 700 EMU at 100mph
7
0532
0532
0531¾
D
0.64
pass
0534
pass
0533¼
D
DF
0.73
pass
0534
pass
0533½
1.44
pass
0535½
pass
0535½
DF
DS
2.41
7
0537
0538
0537
0538½
0537
0538
DS
DF
3.32
pass
0540
pass
0539¾
4.04
pass
0540½
pass
0540¼
4.78
pass
0541½
pass
0541
FL
6.35
3
pass
0542½
pass
0541¾
8.30
3
pass
0543½
pass
0543¼
9.12
3
pass
0544
pass
0544
10.45
3
pass
0545
pass
0544½
12.57
3
pass
0546½
pass
0546¼
14.37
3
pass
0547½
pass
0547
15.45
pass
0548
pass
0547½
17.54
2
pass
0549½
pass
0549¼
20.25
pass
0551
pass
0550½
FL
21.18
pass
0551½
pass
0551
DF
DM
22.00
2
pass
0552
pass
0551½
23.68
pass
0553½
pass
0553
DM
DS
25.03
4
pass
0555
pass
0554
26.59
pass
0556½
pass
0555¼
-1
27.45
4
0558
0559
0558
0559½
0556½
0559
DS
DS
31.74
2
0604
0605
0604
0605
0604¼
0605¼
DS
DRF
34.50
2
0610
0610
0609½
0610
0609¾
0610¾
36.47
2
0613
0613
0612½
0613
0614
0614½
+1
41.00
2
0618
0618
0617½
0618
0619¾
0620¼
+2
44.72
2
0622
0623
0622
0623
0624¼
0625
+2
DR
DR
47.75
2
pass
0626
pass
0627¾
+2
49.67
2
pass
0627
pass
0629¾
+2
50.77
2
pass
0628
pass
0630½
+2
55.26
pass
0632
pass
0635¼
+3
DR
DM
56.32
3
pass
0633
No report
DM
57.48
pass
0636½
No report
57.72
8
0638
0638
0641½
+3
DM