2F51 1828 London Bridge to London Victoria
Departing on 3rd December 2025

operated by
Southern
8 coaches
377458
377135
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 100mph
12
1828
1828
1828
9
0.30
pass
1829½
pass
1829
0.55
pass
1830
pass
1829¾
1.04
pass
1830½
pass
1830½
9
DSS
1.45
pass
1831½
No report
2.00
pass
1832½
pass
1831¾
DSS
DS
2.58
2
1834
1834
1833½
1834½
1832¾
1835¼
DS
DS
3.44
2
1837
1837
1836½
1837
1837¾
1839
+2
4.47
2
1839
1839
1839
1839½
1841
1842¼
+2
5.38
2
1842
1842
1841½
1842
1844
1845
+3
6.20
2
1845
1845
1844½
1845½
1847
1848½
+3
DS
DSY
7.40
4
1850
1856
1850
1856½
1853½
1856½
DSY
UCP
8.19
1
1859
1859
1858½
1859
1859
1900
+1
9.10
1
1902
1902
1901½
1902
1902½
1903
+1
9.34
pass
1903
pass
1904¼
+1
9.61
pass
1903½
pass
1904¾
+1
10.35
1
1906
1906
1905½
1906½
1906½
1908¼
+1
UCP
11.23
pass
1908½
pass
1910½
+2
11.40
2
1910
1910
1909½
1910½
1911½
1912¾
+2
UCP
UBS
12.07
2
1912
1912
1912
1912½
1914½
1915¼
+2
13.35
14
1916
1916
1915½
1916½
1918½
1919¼
+2
UBS
14.08
pass
1918
pass
1920¾
+2
14.69
4
1920
1920
1919½
1920
1922¾
1923¾
+3
15.19
pass
1921
pass
1924½
+3
SL
15.20
pass
1921
No report
16.12
10
1924
1924
1927½
+3
UBS