2F57 1958 London Bridge to London Victoria
Departing on 10th December 2025

operated by
Southern
8 coaches
377136
377443
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 100mph
11
1958
1958
1957¾
9
0.30
pass
1959½
pass
1959
0.55
pass
2000
pass
1959¼
1.04
pass
2000½
pass
2000¼
9
DSS
1.45
pass
2001½
No report
2.00
pass
2002½
pass
2001½
DSS
DS
2.58
2
2004
2004
2003½
2004½
2002½
2004
DS
DS
3.44
2
2007
2007
2006½
2007
2005¾
2007
4.47
2
2009
2009
2009
2009½
2009
2009¾
5.38
2
2012
2012
2011½
2012
2011½
2012¼
6.20
2
2015
2015
2014½
2015½
2014
2014¾
DS
DSY
7.40
4
2020
2026
2020
2026½
2019¾
2025¾
DSY
UCP
8.19
1
2029
2029
2028½
2029
2028¼
2029
9.10
1
2032
2032
2031½
2032
2032¼
2032¾
9.34
pass
2033
pass
2034
+1
9.61
pass
2034
pass
2034½
10.35
1
2036
2037
2036
2037
2036¼
2036¾
UCP
11.23
pass
2039
pass
2038¾
11.40
2
2040
2040
2040
2040½
2039½
2040¼
UCP
UBS
12.07
2
2042
2042
2042
2042½
2041¾
2042½
13.35
14
2046
2046
2045½
2046½
2045½
2046
UBS
14.08
pass
2048
pass
2047½
14.69
4
2050
2050
2049½
2050
2049
2050
15.19
pass
2051
pass
2050¾
SL
15.20
pass
2051
No report
16.12
9
2054
2054
2053¾
UBS