9J28 1025 Horsham to Three Bridges
Departing on 29th November 2025

operated by
Thameslink
12 coaches
700131

This service is partially cancelled

This service was cancelled between Three Bridges and Peterborough due to a problem with the electrified line (I1).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Horsham [HRH]
Pathed as Class 700 EMU at 100mph
3
1025
1025
1029¼
+4
1.06
1
1029
1029
1028½
1029
1033
1033
+4
3.28
pass
1031½
No report
5.70
1
1035
1035
1034½
1035
1039
1040
+5
7.07
1
1038
1038
1037½
1038½
1043
1043¾
+5
8.35
1
1042
1043
1041½
1043
1046¾
+5
UH
10.22
pass
1046
-
11.09
1048
1049
1047½
1049
-
11.76
1051
1051
1051
1051½
-
14.19
pass
1054
-
16.18
pass
1055½
-
18.06
1059
1059
1058½
1059½
-
19.67
1103
1103
1103
1103½
-
23.43
1108
1109
1108
1109
-
24.42
pass
1110½
-
25.33
pass
1111
-
26.28
pass
1112
-
27.41
pass
1113
-
28.34
1115
1115
1114½
1115½
-
28.73
pass
1116½
-
29.37
pass
1117½
-
31.15
pass
1120
-
31.47
pass
1120½
-
32.30
pass
1121
-
33.12
pass
1121½
-
34.03
pass
1122½
-
35.06
pass
1123½
-
35.72
pass
1124
-
37.15
pass
1127
-
37.56
pass
1127½
-
38.05
pass
1128
-
38.30
pass
1128½
-
38.58
1130
1131
1129½
1131
-
39.16
pass
1132½
-
39.47
pass
1135
-
39.75
1136
1137
1136
1137
-
40.23
1138
1139
1138
1139
-
40.55
1141
1141
1140½
1141½
-
42.04
1145
1146
1145
1146
-
42.62
pass
1148½
-
42.71
pass
1148½
-
43.42
pass
1150
-
44.39
1152
1153
1151½
1153½
-
45.30
pass
1155
-
46.02
pass
1155½
-
46.76
pass
1156½
-
48.33
pass
1157½
-
50.28
pass
1158½
-
51.10
pass
1159
-
52.43
pass
1200
-
54.55
pass
1201½
-
56.35
pass
1202½
-
57.43
pass
1203
-
59.52
pass
1204½
-
63.16
pass
1206½
-
63.78
pass
1207
-
65.66
pass
1208½
-
67.01
pass
1210
-
68.57
pass
1212½
-
69.43
1214
1216
1214
1216
-
73.72
1222
1222
1221½
1222½
-
79.01
1228
1228
1227½
1228
-
83.11
1233
1233
1232½
1233½
-
86.08
1237
1237
1237
1237½
-
93.56
1244
1245
1244
1245
-
100.68
1252
1252
1251½
1252½
-
109.28
pass
1259½
-
111.10
pass
1301
-
117.00
pass
1305½
-