9J81 2022 London Bridge to Three Bridges
Departing on 1st December 2025

operated by
Thameslink

This service is partially cancelled

This service was cancelled between Three Bridges and Horsham due to a signalling problem (track circuit failure) (IC).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
2022
2022
-
0.30
pass
2023½
-
0.55
pass
2024
-
1.04
pass
2024½
-
1.45
pass
2026
-
2.58
pass
2028½
-
3.44
pass
2029
-
4.47
pass
2030
-
5.38
pass
2031
-
6.20
pass
2031½
-
7.03
pass
2032½
-
7.35
pass
2033½
-
9.13
pass
2036
-
9.57
pass
2036½
-
10.16
2038
2038
2037½
2038½
-
11.09
pass
2040
-
12.22
pass
2041
-
13.17
pass
2042
-
14.08
pass
2043
-
21.26
pass
2048½
-
23.25
pass
2050
-
25.48
pass
2052
-
26.35
2053
2055
2053
2055
-
27.22
pass
2056½
-
29.09
3
2100
2101
2059½
2101
2059
30.37
2104
2105
2104
2105
-
31.54
pass
2106½
-
34.16
pass
2108½
-
36.38
pass
2110
-
37.44
2114
2114
-