9R21 1104 Bedford to Gatwick AirportDeparting on 4th December 2025
operated by
Thameslink
8 coaches








700036
This service is partially cancelled
This service was cancelled between Gatwick Airport and Three Bridges due to a signalling problem (track circuit failure) (IC).
GBTT
WTT
Realtime
Route
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line