1852 Cambridge to Three BridgesDeparting on 8th December 2025
operated by
Thameslink
12 coaches












This service is partially cancelled
This service was cancelled between Three Bridges and Brighton due to the train operator's request (TB).
Planned
Realtime
Location
Pl
Arr
Dep
Arr
Dep
Dly