2E63 1009 Dalmuir to Balloch
Departing on 20th December 2025

operated by
ScotRail

This service is partially cancelled

This service was cancelled between Airdrie and Dalmuir due to a problem with the brakes (MN).

This service is cancelled.

This service was cancelled due to a problem with the train (M8).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Airdrie [ADR]
Pathed as Electric multiple unit at 75mph
0913
0913
-
0.68
0916
0916
0915½
0916
-
1.67
0918
0919
0918
0919
-
1.75
pass
0919½
-
2.43
0921
0921
0921
0921½
-
5.08
0925
0925
0925
0925½
-
6.08
0928
0928
0927½
0928
-
7.21
0930
0931
0930
0931
-
8.02
0933
0933
0932½
0933
-
9.63
0936
0936
0936
0936½
-
10.10
pass
0937½
-
10.33
0938
0939
0938
0939
-
10.78
0941
0943
0940½
0943½
-
11.58
0945
0946
0945
0946
-
12.57
pass
0948
-
13.10
pass
0948½
-
13.36
0950
0950
0949½
0950
-
14.12
0952
0953
0951½
0953½
-
14.39
pass
0954½
-
14.63
pass
0955
-
15.07
0956
0956
0956
0956½
-
16.33
0959
0959
0959
0959½
-
17.43
1002
1002
1001½
1002
-
18.33
1004
1004
1003½
1004
-
19.28
1006
1006
1006
1006½
-
20.13
1
1009
1009
1008½
1009
1010½
+1
DH
21.40
2
1011
1011
1011
1011½
1012¾
1013¼
+1
23.13
2
1014
1014
1014
1014½
1016
1016½
+2
25.76
2
1019
1019
1018½
1019
1020¼
1021
+2
26.54
2
1021
1021
1020½
1021
1022½
1023¼
+2
27.04
2
1023
1023
1022½
1023
1024¼
1024¾
+1
DH
B
28.57
1
1026
1026
1025½
1026
1027
1028
+2
29.66
1
1028
1028
1028
1028½
1030¾
1031½
+3
31.01
1
1032
1032
1033¾
+1
B