2V75 2356 Edinburgh to Bathgate
Departing on 11th December 2025

operated by
ScotRail
6 coaches
334034
334037
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Edinburgh [EDB]
Pathed as Electric multiple unit at 75mph
13
2356
2356
2356½
W
0.32
pass
2357½
pass
2357¾
W
DS
1.19
4
0001
0001
2359½
0001
2359¾
0000¾
DS
1.66
pass
0002
pass
0002
2.28
pass
0002½
pass
0002¾
DS
DEG
4.67
2
0005
0005
0005
0005½
0005½
0005¾
8.24
pass
0010
pass
0009½
DEG
DB
12.38
2
0015
0015
0015
0015½
0013¾
0014½
14.42
2
0019
0019
0018½
0019
0017½
0018¼
18.33
2
0023
0023
0022½