5B74 1145 Edinburgh to Haymarket Depot
Departing on 1st December 2025

operated by
ScotRail
Inter7City (4 coaches)
43147
43151
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Edinburgh [EDB]
Pathed as Diesel locomotive, trailing load 324 tonnes at 100mph
17
1145
1144¼
Y
0.32
pass
1146½
pass
1145½
Y
DN
1.19
2
1148½
1149
1147¾
1148
-1
1.66
pass
1151½
No report
2.07
1153
1152
-1