5B74 1145 Edinburgh to Haymarket Depot
Departing on 5th December 2025

operated by
ScotRail
Inter7City (5 coaches)
43145
43142
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Edinburgh [EDB]
Pathed as Diesel locomotive, trailing load 324 tonnes at 100mph
19
1145
1143½
-1
Z
0.32
pass
1146½
pass
1145
-1
Z
DN
1.19
2
1148½
1149
1147½
1148
-1
1.66
pass
1151½
No report
2.07
1153
1152
-1