9R38 1356 Three Bridges to Bedford
Departing on 23rd April 2024

operated by
Thameslink

This service is cancelled.

This service was cancelled due to a signalling problem (track circuit failure) (IC).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
1356
1356
-
1.67
pass
1358½
-
2.54
1400
1402
1400
1402½
-
3.41
1405
1405
1404½
1405
-
5.64
1409
1409
1408½
1409
-
7.63
1412
1412
1412
1412½
-
9.51
1416
1418
1416
1418
-
11.32
pass
1420
-
15.08
pass
1423½
-
16.07
pass
1424½
-
16.78
1426
1427
1426
1427
-
17.73
pass
1428½
-
19.06
1430
1430
1430
1430½
-
19.79
1433
1433
1432½
1433½
-
20.38
pass
1434½
-
21.02
pass
1435½
-
21.52
1437
1438
1437
1438
-
22.60
pass
1439½
-
23.12
pass
1440
-
23.75
pass
1441
-
24.57
pass
1441½
-
25.48
pass
1442½
-
26.51
pass
1443½
-
27.37
pass
1444
-
28.60
pass
1446
-
29.21
pass
1447
-
29.50
pass
1447½
-
29.75
pass
1448½
-
30.23
1450
1451
1449½
1451
-
30.61
pass
1452½
-
31.12
pass
1455
-
31.40
1456
1457
1456
1457
-
31.66
1458
1459
1458
1459
-
32.10
1501
1501
1500½
1501½
-
33.39
1505
1506
1505
1506
-
34.20
pass
1508½
-
34.67
pass
1510½
-
35.09
pass
1511
-
35.37
pass
1511½
-
38.12
pass
1514
-
38.33
pass
1514
-
38.43
pass
1514
-
39.07
pass
1514½
-
39.28
pass
1514½
-
40.23
pass
1515
-
41.16
pass
1515½
-
42.52
pass
1516½
-
47.57
pass
1519½
-
48.41
pass
1520
-
51.24
pass
1522
-
53.15
1524
1525
1523½
1525
-
57.49
pass
1529½
-
57.75
1531
1531
1530½
1531½
-
62.43
1536
1537
1536
1537
-
63.43
1540
1541
1540
1541½
-
63.76
pass
1542½
-
66.04
1545
1545
1544½
1545½
-
66.42
pass
1546
-
68.73
pass
1548
-
70.46
1550
1550
1549½
1550
-
73.42
1554
1554
1553½
1554
-
73.71
pass
1555
-
80.42
pass
1602
-
82.04
pass
1603½
-
83.09
1606
1606
-