1K05 0625 London Bridge to Epsom
Departing on 25th April 2024

operated by
Southern

This service is cancelled.

This service was cancelled due to overrunning engineering works (I5).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
0625
0625
-
0.30
pass
0626½
-
0.55
pass
0627
-
1.04
pass
0627½
-
1.45
pass
0628½
-
2.58
pass
0630½
-
3.44
pass
0631
-
4.47
pass
0632
-
5.38
pass
0633
-
6.20
pass
0633½
-
7.03
pass
0634½
-
7.35
pass
0635
-
8.43
0637
0639
0637
0639
-
9.13
pass
0641
-
10.23
0644
0645
0644
0645
-
11.28
0647
0647
0647
0647½
-
12.73
0651
0651
0650½
0651
-
13.66
0653
0653
0653
0653½
-
14.69
0658
0658
0657½
0658½
-
15.58
0701
0701
0701
0701½
-
17.09
0704
0704
0704
0704½
-
18.55
0708
0708
-