5Y00 0429 Barry Tourist Railway to Barry Island
Departing on 20th April 2024

operated by
Transport for Wales
2 coaches
Barry Tourist Railway - Barry Down Siding
150260
2 coaches
Barry Down Siding - Barry Signal Cf7283
150260
2 coaches
Barry Signal Cf7283 - Barry Island
150260
WTT
RTTRealtime
Route
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
Barry Tourist Railway
Pathed as Class 150/153/155/156 DMU at 75mph
0429
No report
Dn
Barry Down Siding
Service reverses here
0444
0449
No report
0451
0456
No report
3
0500
0500
N/R
0450
-9
UDB
1
0504
0453¼
-10
UDB