2H22 2146 London Charing Cross to Tonbridge
Departing on 8th May 2024

operated by
Southeastern

This service is partially cancelled

This service was cancelled between Tonbridge and Tunbridge Wells due to a problem with the electrified line (I1).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
6
2146
2146
2156
+10
UXF
0.61
C
2149
2149
2148½
2149½
2158¾
2200
+10
1.23
pass
2151
pass
2201½
+10
DXF
DCX
1.31
pass
2151½
pass
2201½
+10
1.69
7
2153
2154
2153
2154½
2203½
2204½
+10
DCX
7
2.17
pass
2155½
pass
2205½
+10
2.42
pass
2156
pass
2206
+10
2.71
pass
2156½
pass
2206½
+10
3.32
pass
2157
pass
2207
+10
7
DKF
4.68
pass
2159
pass
2209¾
+10
DKF
DF
5.29
pass
2200
pass
2211
+11
5.47
pass
2200
pass
2211½
+11
6.36
pass
2201
pass
2212¼
+11
DKF
DKF
7.16
2
pass
2202½
pass
2214
+11
FL
7.44
pass
2203
pass
2214
+11
8.78
3
pass
2204½
pass
2215¾
+11
FL
10.21
2
pass
2205½
pass
2217
+11
11.19
2
pass
2206½
pass
2217¾
+11
12.24
pass
2207½
pass
2218½
+11
12.53
2
pass
2208
pass
2219
+11
13.65
3
2210
2210
2209½
2210½
2220¾
2221¾
+11
DF
DM
15.25
2
pass
2212½
pass
2224¼
+11
16.44
2
pass
2213½
pass
2225½
+12
20.46
2
pass
2217
pass
2228¾
+11
22.09
3
2219
2220
2219
2220
2231
2231½
+11
DM
DM
27.02
2
2226
2226
2225½
2226
2237½
2238½
+12
29.46
4
2230
2232
2229½
2232
2244¼
+14
DM
30.27
pass
2233½
-
32.74
2237
2237
2237
2237½
-
33.60
pass
2239
-
34.36
2241
2241
-