2S35 1252½ London Waterloo to Weybridge
Departing on 20th April 2024

operated by
South Western Railway
8 coaches
450069
450049
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
22
1252
1252½
1252½
WR1
0.40
pass
1254
pass
1253½
WR1
DWF
1.29
3
1256
1256
1256
1257
1255¾
1256¾
1.78
pass
1258½
pass
1257¾
DWF
DW
2.50
3
1259
1259
1259½
1300
1259¼
1300
DW
DWF
3.17
pass
1301
pass
1301
3.74
5
1302
1302
1302
1303
1302½
1303½
4.60
2
1305
1305
1305
1305½
1305¼
1306¼
5.72
3
1307
1308
1307½
1308½
1308¼
1309¼
7.07
3
1311
1313
1311
1313
1311½
1312¾
DWF
DH
7.54
2
1315
1315
1314½
1315
1314½
1315½
8.47
2
1317
1318
1317
1318
1317½
1318½
9.34
pass
1319½
pass
1320
9.53
2
1320
1320
1320
1320½
1320½
1321½
+1
10.01
pass
1321½
pass
1322
10.52
2
1323
1323
1322½
1323½
1323½
1324¼
11.34
2
1325
1325
1325
1325½
1326
1326¾
+1
12.10
2
1327
1327
1327
1327½
1328¼
1329½
+2
13.40
2
1330
1333
1330
1333½
1331½
1332½
14.19
pass
1335
pass
1333¾
-1
14.48
pass
1336
pass
1334½
-1
DH
DT
16.01
2
1339
1339
1338½
1339½
1337½
1338½
18.53
2
1343
1343
1343
1343½
1342
1342¾
20.15
2
1347
1347
1346½
1347½
1345¼
1346¾
22.15
2
1352
1352
1351½
1352
1351¼
1352
24.28
4
1356
1356
1356
1356½
1356
1356½
DT
DC
26.68
1
1401
1402
1401
1402
1401
1402
28.22
1
1405
1405
1404½
1405
1404¼
1405½
29.25
pass
1406½
pass
1407
30.05
Approaching
Weybridge [WYB]
1
1409
1409
1409¾
DC